Topic: How to synchronize two schedules in two nions?
Two nions in a P.A. system. One is main, the other one is a backup. They are all in a same network.
I set up a schedule to mute output channels in the main node, and set up a same schedule in the backup node.
How to synchronize the two schedules when I edit the time in one of the two schedules?
I use Nware 1.4.1.
Thanks